A patented particle precipitation system that reduces cooling tower water consumption by 15–20% and chiller energy usage by 12–15% — with zero downtime and zero disruption to your operation.

1) The Hidden Cost Inside Every Cooling Tower

Every cooling tower continuously draws in airborne debris — dust, pollen, dirt, biological matter — through its open condenser loop. That debris becomes suspended solids in your water. As those solids accumulate, they coat the surfaces of your chiller tubes and heat exchangers with a microscopic layer of scale and biofilm.

That layer degrades thermal transfer efficiency across your entire system — forcing your chillers to work harder, consume more energy, and draw more makeup water than necessary. The result compounds silently across weeks, months and years. It never shows up as a single line item. It just quietly drives up your operating costs while slowly degrading your equipment.

Stats Section
15–20%
Water Reduction
12–15%
Energy Savings
98–99%
Solids Removed
24 Mo
ROI
100+
Installations

2) Particle Precipitation — Not Filtration. Not Chemicals.

Traditional approaches rely on chemical treatment — which manages the symptom without removing the source — or media filtration, which requires ongoing maintenance and replacement. Our system works differently.

A skid-mounted particle precipitator runs in parallel with your existing cooling tower and chilled water systems. It removes 98–99% of suspended solids down to 1 micron through a continuous automated process — no media, no downtime, no disruption.

High-voltage, low-amp electrode actively cleans existing scale from pipe walls and chiller tubes

Removes suspended solids to 1 micron with no filter media

Prevents new fouling from forming continuously

Works on both open and closed loop cooling systems

Complements existing chemical programs — does not replace them

Purges sediment once daily through automated self-cleaning cycle

3) Verified Results Across 100+ Installations

Results are not projections. They are documented outcomes verified by independent third-party laboratory analysis across more than 100 installations in commercial, industrial, government, healthcare, university and data center environments.

University of Missouri Kansas City — Independent Engineering Verified

6,127 ppm suspended solids on Day 1. 106 ppm after 30 days — a 98.3% reduction.

15% reduction in energy usage. $69,656 in avoided energy costs confirmed by licensed P.E. engineering firm.

Campus added 57,000 sq ft of cooled space without any chiller plant capacity upgrade.

“The cleanliness of the chillers when we open them for winter maintenance and the sump not being covered by 6+ inches of muck is our proof the system works.”

Scott Duck — Supervisor HVAC Operations, University of Missouri Kansas City

4) Who It Is Built For

This system is designed for facilities where cooling system performance directly impacts operating costs, water consumption and infrastructure reliability. It is actively operating at:
US Capitol Building — 5 systems installed
US Department of Veterans Affairs
Google
Lockheed Martin — 2 aerospace sites
Toyota, Honda, Nissan — manufacturing
Major hospital networks — Ascension, Penn State Hershey, Children’s Mercy
University campuses — Penn State, UNC, University of Arkansas
Data centers — Equinix AT4
AT&T, Verizon — communications centers
Federal Reserve Bank, Morgan Stanley, Navy Federal
If your facility has a cooling tower or chilled water system, it qualifies for a preliminary assessment.

5) How We Get You to Real Numbers

We do not give general estimates. Every analysis is specific to your facility, your systems and your actual usage data. There is no cost for the assessment and no obligation to proceed.
  1. Complete the Intake Survey
    Your facilities team fills out a brief 10-minute form covering system tonnage, water usage, energy usage, and the current chemical program.
  2. Engineering Assessment
    Our engineering team sizes the appropriate system for your facility and produces a fully customized cost and savings analysis.
  3. Review Real Numbers
    You receive projected water savings, energy savings, system cost, and ROI timeline — specific to your building. No estimates. No guesswork.
  4. Installation — Zero Downtime
    The skid-mounted system installs in parallel with your existing cooling infrastructure with no disruption to your operation at any point.

Request a Free Facility Assessment

Complete the intake survey and our engineering team will provide a customized cost and savings analysis for your facility within 5 business days.

Share This