Your Cooling Tower Is Costing You More Than You Think
Our Services
LET’S START WORK TOGETHER
Let’s embark on a journey to sustainability together – reach out today and take the first step towards a greener future!
(508) 400-9236
nvalorie@ecrenewable.com
1) The Hidden Cost Inside Every Cooling Tower
Every cooling tower continuously draws in airborne debris — dust, pollen, dirt, biological matter — through its open condenser loop. That debris becomes suspended solids in your water. As those solids accumulate, they coat the surfaces of your chiller tubes and heat exchangers with a microscopic layer of scale and biofilm.
That layer degrades thermal transfer efficiency across your entire system — forcing your chillers to work harder, consume more energy, and draw more makeup water than necessary. The result compounds silently across weeks, months and years. It never shows up as a single line item. It just quietly drives up your operating costs while slowly degrading your equipment.
2) Particle Precipitation — Not Filtration. Not Chemicals.
A skid-mounted particle precipitator runs in parallel with your existing cooling tower and chilled water systems. It removes 98–99% of suspended solids down to 1 micron through a continuous automated process — no media, no downtime, no disruption.
3) Verified Results Across 100+ Installations
University of Missouri Kansas City — Independent Engineering Verified
6,127 ppm suspended solids on Day 1. 106 ppm after 30 days — a 98.3% reduction.
15% reduction in energy usage. $69,656 in avoided energy costs confirmed by licensed P.E. engineering firm.
Campus added 57,000 sq ft of cooled space without any chiller plant capacity upgrade.
“The cleanliness of the chillers when we open them for winter maintenance and the sump not being covered by 6+ inches of muck is our proof the system works.”
Scott Duck — Supervisor HVAC Operations, University of Missouri Kansas City
4) Who It Is Built For
5) How We Get You to Real Numbers
- Complete the Intake Survey
Your facilities team fills out a brief 10-minute form covering system tonnage, water usage, energy usage, and the current chemical program. - Engineering Assessment
Our engineering team sizes the appropriate system for your facility and produces a fully customized cost and savings analysis. - Review Real Numbers
You receive projected water savings, energy savings, system cost, and ROI timeline — specific to your building. No estimates. No guesswork. - Installation — Zero Downtime
The skid-mounted system installs in parallel with your existing cooling infrastructure with no disruption to your operation at any point.
Request a Free Facility Assessment
Complete the intake survey and our engineering team will provide a customized cost and savings analysis for your facility within 5 business days.